Basic Info.
Model NO.
Steel slag grinding plant
Rotationl Speed
21-23r/min
Application
Cement Plant, Clinker Grinding Unit, Steel Mill
Materials
Slag, Waster Slag, Blast Furnace Slag
Equipment
Grms Slag Vertical Mill
Transport Package
Standard Packaging
Specification
200, 000-1, 500, 000 t/y
Origin
Xinxiang City, Henan Province, China
Product Description
Product descriptionThe grinding mill machine is designed to produce super fine powder or micro powder of different materials with hardness less than 6 in Moh's scale and humidity less than 6 percent such as kaolin, limestone, calcite, marble, talcum, barite, gypsum, dolomite, bentonite mud, mica, pyrophyllite, sepiolite, diatomite, graphite, alunite, fluorite, potassium feldspar, phosphorite, pigment and so on. The granularity of the end products is 325-2500 meshes (0.044-0.0055mm).
CHAENG slag vertical roller mill is applied to the construction of GGBFS production line, such as Indonesia with 300,000 tons/year nickel slag powder production line. Our slag vertical mill is typically designed to deal with industrial waste residues generated by the blast-furnace ironmaking. Due to its high physical and chemical activity, and potential hydraulicity, the slag has been widely as admixture matters in the cement industry. And the slag can replace the cement in the concrete to improve the quality and durability of the concrete.
Introduction of blast furnace slag production line:
Annual Output : 200,000-1,500,000 tons
Main Equipment : GRMS Steel slag vertical mill
Grinding Material : Steel Slag , Water Slag , Blast Furnace Slag
Equipment matching : Belt feed+Vibrating screen+slag vertical mill+hot blast stove+dust collector+warehouse
The product of the CHAENG ( Great Wall Machinery ) production steel slag vertical roller mill is the equipment to grind Ground Granulated Blast furnace Slag into small particles . steel slag(fineness:4200-4500cm2/g) produced by vertical roller mills are being used to substitute clinker in conventional cement manufacturing as well as to partially replace OPC for ready-mixed concrete production, for which the percentage of GGBS usage is typically at 10-15% and 20-25% respectively.
Steel slag is the waste residue in the process of steel making, including converter slag and electric furnace slag, approximately takes 15-20 percent of crude steel capacity , It occupies a large proportion of industrial waste.
CHAENG can undertake 20 tons --1.5 million tons of Blast furnace slag/Steel slag/Nickel slag/Manganese slag powder production EPC projects.We can provide raw material testing , engineering design,equipment manufacturing,install,debugging,technical training,standard production,production contract and "turnkey" service.
Slag Powder Grinding Plant Process Description
Forklift will transfer the steel slag from the slag pile, then the slag will transported to the weighting silo.
during the transportation, the steel slag will be magnetized and sieved to remove the iron parts. The pre-processed slag then fed to the vertical mill by the elevator for grinding.
After grinding, the steel slag will be classified and dried by the hot air generator.
The required steel slag powder then to be collected by the dust collector and transferred to the final product ware house by air delivery chute and elevator.
Slag Powder Grinding Plant Specifications
Suggestions for the equipment selection
CHAENG already has more than 100 customers currently, and almost 80% of them built slag grinding plant with annual capacity of 1,000,000 tons, 600,000 tons, 300,000 tons. Below table has shown the three main equipment in aspects of model selection, energy consumption and so on.
slag powder processing grinding mill/slag processing plant features
A good return on investment, can recover the cost effective
With the application widely of mineral powder, the domestic market demand increase rapidly in slag processing plant europe/slag processing plant project. Investment with slag processing plant europe/slag processing plant considerable economic benefit and high return on investment, usually 1-3 years can recover the cost.
High efficiency, energy saving, environmentally friendly
slag processing plant europe/slag processing plant can reduce power consumption effectively in the process of production as the core equipment of slag processing plant europe/slag processing plant. Meanwhile, mill internal is negative pressure in process, which produces almost no dust during operation, lower noise and pollution than traditional slag processing plant europe/slag processing plant.
Mature general contrasting scheme
Great Wall has the domestic first-class technical team, and combined with domestic chief slag processing plant europe/slag processing plant expert for technology. Great Wall Machinery can design detail general scheme according to customer's actual situation, and can provide "turnkey service" from civil engineering to production operation.
The customers cases witness all over the country
Great Wall Machinery slag processing plant europe/slag processing plant has been recognized by key customers, the domestic production operation of the slag processing plant europe/slag processing plant has been up to more than 30, customers all over the country.
slag processing plant europe/slag processing plant revenue:
1. 3 years for cost recovering
2. Scientific process optimization and control are used to low down the energy consumption
3. Shorten EPC slag processing plant /slag processing plant period, save your time-cost.
Customer stories
In November, 2015, chairman of Indonesia Growth Steel Group came to CHAENG and signed the EPC Turkey Project contract of 300,000 t/y nickel slag grinding plant.
In May 2016, the vertical mill, auxiliary machine, and accessories of 300,000 t/y nickel slag grinding plant ordered by Indonesia Growth Steel Group were sent to Indonesia;
In September 2016, the project design, civil construction and equipment manufacturing of 300,000 t/y nickel slag grinding plant for Indonesian Growth Steel Group has been successfully completed, equipment installation and commissioning work were also near the end.
On November 3, 2016, 300,000 t/y nickel slag grinding plant EPC project of Indonesia was completed and put into production!
About CHAENG
Founded in 1958 and located in Xinxiang, Henan province, CHAENG with 60-year experience in equipment manufacturing covers an area of 330,000 m2 and its annual production value is 1 billion yuan. The company specializes in manufacturing tube mills, rotary kilns, vertical mills and large steel casting and can undertake the EPC projects of cement production lines, active lime production lines, blast furnace slag/ steel slag/ nickel slag grinding plants, and its products are sold to more than 50 countries and regions in Southeast Asia, Central Asia, South Asia, North America, South America and Europe.
Our long-term strategic partners: Arcelor Mittal, Tata Group, Pohang Iron and Steel Company, Germany CCE, Japan Chiba , Shanghai Baosteel,Voestalpine and ASGT.
Address:
Mengzhuang Town, Huixian City, Henan Province, China
Business Type:
Manufacturer/Factory
Business Range:
Industrial Equipment & Components, Manufacturing & Processing Machinery, Metallurgy, Mineral & Energy
Management System Certification:
ISO 9001
Company Introduction:
Founded in 1958, Xinxiang Great Wall Machinery Co., Ltd. is a well-known national high-tech enterprise specializing in the development, production and sales of large-scale building materials making equipment including crushing and grinding equipment. It covers an area of 700, 000 square meters and has a total asset value of RMB 500 million.
We have strong engineering design ability and perfect project management ability, and basing on it, we integrate supply chain resources vigorously. We can undertake production lines of different capacities from the new factory design to the production management. We can not only provide EPC turnkey projects, but also provide customized engineering design, civil construction, engineering installation, equipment R & D and manufacturing, personnel training, production commissioning, spare parts service, production management according to owners requirements.
The company has passed the three major certifications of quality, environment and health. With more than 500 sets of high-precision equipment and a large casting base with an annual output of 50, 000 tons, we independently develop different types of machines covering crushing, screening, washing and conveying, which can meet the production requirements of stone with different characteristics.
With more than 60-year experience, Xinxiang Great Wall strives to explore new business development models and expand new business areas basing on its existing main business. The new business includes active lime production line and other products related to the building materials industry. We help our clients and partners have good development by extending the industrial chain.